(Summary description)The first draft of "Jiangxi Yuhang New Materials Co., Ltd.'s annual output of 8,000 tons of tert-butyl peroxybenzoate production line project environmental impact report" has been completed. According to the relevant provisions of the "Interim Measures for Public Participation in Environmental Impact Assessment" implemented on January 1, 2019, the following information is announced to the public:
Jiangxi Yuhang New Materials Co., Ltd. has an annual output of 8,000 tons of tert-butyl peroxybenzoate production line project environmental impact assessment public participation announcement
(Summary description)The first draft of "Jiangxi Yuhang New Materials Co., Ltd.'s annual output of 8,000 tons of tert-butyl peroxybenzoate production line project environmental impact report" has been completed. According to the relevant provisions of the "Interim Measures for Public Participation in Environmental Impact Assessment" implemented on January 1, 2019, the following information is announced to the public:
- Categories:company news
- Author:
- Origin:
- Time of issue:2020-09-25
- Views:0
The first draft of "Jiangxi Yuhang New Materials Co., Ltd.'s annual output of 8,000 tons of tert-butyl peroxybenzoate production line project environmental impact report" has been completed. According to the relevant provisions of the "Interim Measures for Public Participation in Environmental Impact Assessment" implemented on January 1, 2019, the following information is announced to the public:
1. Brief description of the construction project
Name of construction project: production line project with an annual output of 8,000 tons of tert-butyl peroxybenzoate;
Construction unit: Jiangxi Yuhang New Materials Co., Ltd.;
Construction nature: new construction;
Proposed location: Yuanzhou District Pharmaceutical Industrial Park;
Total investment: 300 million yuan;
Construction scale: The total construction area is 3999 square meters;
Area: 16061 square meters.
Construction content: production workshop, office building, warehouse, power distribution room, accident emergency pool, fire pool, etc.
Labor quota and production shift system: The project labor quota is 240 people, three shifts, 300 working days per year.
3. Main pollutants of the project and prevention and control measures
1. The main pollution sources of construction projects
(1) Exhaust gas: The air pollutants of the project are mainly process exhaust gas, canteen oil fume, waste gas from sewage treatment station, etc.
(2) Wastewater: The wastewater of this project is mainly process wastewater, domestic sewage, vacuum pump wastewater, equipment and ground equipment washing wastewater, etc.
(3) Noise: The noise source of this project is mainly the noise of vacuum pump, Roots pump, air compressor, fan and other equipment.
(4) Solid waste: The solid waste of this project is mainly the domestic waste of employees, sludge of sewage treatment station, and waste packaging materials.
2. Main environmental protection countermeasures and measures taken by the project
(1) Wastewater: The project process wastewater, domestic sewage, vacuum pump wastewater, equipment and ground equipment washing wastewater, etc. are collected through pipelines and then discharged into the sewage treatment station in the plant area. After biochemical treatment, it reaches the takeover standard of the sewage treatment plant in the Economic and Technological Development Zone, and enters the advanced treatment of the sewage treatment plant in the Economic and Technological Development Zone. Little impact on water environment.
(2) Acoustic environment: use low-noise equipment; strengthen the airtightness of doors and windows in the production workshop; do a good job of greening around the factory area to form a noise control isolation belt; arrange work and rest time reasonably, and reduce production at night as much as possible for some high-noise equipment After the operation and other measures, the noise at the factory boundary can meet the requirements of Category 3 standards in the Emission Standard for Environmental Noise at the Boundary of Industrial Enterprises (GB12348-2008).
(3) Ambient air: The odor and waste gas from the sewage treatment station are absorbed and treated by activated carbon. In the production process, the organic waste gas is collected by pipeline + water absorption treatment, and the removal efficiency is 90%. The process waste gas treatment can meet the requirements of the local standard of Jiangxi Province "Volatile Organic Compound Emission Standard Part 2: Organic Chemical Industry" (DB36/1101.2-2019) standard requirements . The odorous waste gas from the sewage treatment station is pumped and transported to the low-concentration odorous gas treatment facility. After the spray absorption process, the removal efficiency of H2S and NH3 is above 90%. Emission Standard (GB14554-93) secondary standard requirements, the exhaust gas is discharged through a 15-meter-high exhaust pipe; the canteen oil fume is discharged after being treated by a fume purifier, which meets the small and medium-scale emission of the "Food Fume Emission Standard for the Catering Industry" (GB18483-2001). standard. Through scientific management and standardized operation of unorganized exhaust gas in the factory area, the impact of unorganized emission of exhaust gas can be controlled to a minimum level and meet the corresponding standard requirements.
Through scientific management and standardized operation, the impact of fugitive emissions of exhaust gas can be controlled to a minimum level and meet the corresponding standard requirements.
(4) Solid waste: Domestic waste shall be cleared and transported by the sanitation department in time and landfilled in a sanitary landfill. Sludge from the sewage treatment station shall be handed over to qualified units for treatment. Waste packaging materials are recycled by suppliers.
(5) Risk analysis: There are risks of leakage, fire and explosion in the production process of the project. In accordance with the prevention, emergency and mitigation measures proposed in the report, an emergency plan is formulated to make the environmental risk reach an acceptable level.
4. Conclusion of rationality analysis of site selection
(1) Local industrial planning and economic development status
The project is located in Yuanzhou District Pharmaceutical Industrial Park. The construction of the project conforms to the overall planning requirements of Yuanzhou District.
(2) Regional environmental function planning
The ambient air in the evaluation area meets the Class II standard of the "Ambient Air Quality Standard", the surface water quality meets the Class III standard of the "Surface Water Environmental Quality Standard", and the current status of the acoustic environment meets the Class III standard of the "Acoustic Environment Quality Standard". The prediction results show that the construction of this project will not change the functional requirements of regional surface water, ambient air, and acoustic environment.
(3) Project construction conditions
The land used for this project belongs to the industrial land of the industrial park, which has been leveled. There is no land acquisition, demolition or relocation, and no farmland is occupied. The site has convenient transportation and complete facilities such as water and electricity.
V. Scope of soliciting public opinions
Units, residents and villages around the project construction site.
6. Internet link to the full text of the environmental impact report for comments, and ways and means of viewing the paper report
Inspection method: apply to the construction unit for inspection.
7. Internet link to the public opinion form
8. The main methods of public opinion
1. To make comments or suggestions in the form of letters and letters;
2. Provide valuable suggestions or opinions by telephone or fax;
3. Put forward opinions or suggestions to the local environmental protection authority or construction unit;
9. The starting and ending time of public comments
If the public has any comments or suggestions on this construction project, please submit them within 5 working days from the date of this announcement.
10. Name and contact information of construction unit
Name of construction unit: Jiangxi Yuhang New Materials Co., Ltd.;
Contact person: Zhang Baogeng;
Tel: 15879883311.
11. Name and contact information of the unit undertaking the environmental impact assessment
Name of the environmental impact assessment agency: Yichun Yixin Environmental Protection Technology Co., Ltd.
Contact address: No. 36, Yiyang Avenue, Yichun City
Contact: Zhang Yumin Tel: 0795-3998890.
Scan the QR code to read on your phone
News
Founded in 2020
Jiangxi Yuhang New Materials Co., Ltd. and Jiangxi Provincial Pharmaceutical Industrial Park Management Committee signed an investment contract and an agreement on entering the park in June 2020. The general information is: located in the chemical industry concentration area of Yuanzhou District, Yichun City, Jiangxi Province, with a land area of 24.1 mu, a total investment of 300 million yuan, and a planned investment of 160 million yuan in 2021.
Copyright © 2021 Jiangxi Yuhang New Materials Co., Ltd. All rights reserved. SEOLabel 赣ICP备2022001995号-1 www.300.cn